Location:
McEwen, TN
Area:
89, 648 SQ. FT.
Duration:
28 Months
About the Project
The McEwen High School renovation and expansion project was envisioned as part of a larger plan to alleviate the damage caused to Humphreys County’s educational infrastructure by the devastating floods of 2021.
FourSeasons was contracted by Lashlee-Rich, Inc. to provide customized HVAC and clean air solutions for this K-12 school project.
A comprehensive HVAC system was installed throughout the 89,648 square-foot area to efficiently service the new cafeteria, gymnasium, auditorium, library, and a two-story building containing 34 classrooms.
Our scope included installing 22 Trane rooftop units, a kitchen exhaust hood with connected exhaust fans, and make-up air units. We also set 50 VAV terminal units, ductwork, grilles/diffusers, and louvers throughout the building, including fabric duct in the new gymnasium for more efficient airflow dispersion. All connected to a Trane DDC controls system.
The McEwen High School project was completed for Lashlee-Rich, with all systems successfully installed, tested, and operational.
Equipment Installed:
• 22 Trane Precedent rooftop units
• Bard wall-mounted heat pumps
• 59 Trane VAV terminal units
• Greenheck exhaust fans
• CaptiveAire kitchen hood, exhaust fans, and make-up air units
• Mitsubishi ductless split systems